Ridge-Culver Volunteer Fire Association

Company Training "Big Water Drill"

Print this story (opens in a new tab)News RSS feed (opens in a new tab)Share on Facebook (opens in a new window)Share on X (opens in a new window)Add a comment

By Firefighter Kevin Carr
June 10, 2019

The company training this month conducted by the Lieutenant's was a "Big Water" refresher/training. The volunteers laid out 400' of 5" hose from the Engine to the Tower using the big water set-up from a hydrant. Crews refreshed/trained on operating and setting up the Tower and the Engine for big water flow. Crews also refreshed/trained on the hydrant assist, portable hydrant, straight gate valve, pump pressures with elevation, hydrant operation and always hose packing 101. Training to protect and serve the citizens of Cambridge, Dorchester County MD.

Units: Chief 1, Engine 1-3, Engine 1-2, Tower 1
 
 

Add a Comment 0 Comment(s)


Firehouse Solutions

Copyright © 2026 Firehouse Solutions (A Service of Technology Reflections, Inc.)